Plugins: - misc_fixes v2.8: Pre-processing, container remux, stream conforming - stream_organizer v4.8: English priority, subtitle extraction, SRT conversion - combined_audio_standardizer v1.13: AAC/Opus encoding, downmix creation - av1_svt_converter v2.22: AV1 video encoding via SVT-AV1 Structure: - Local/ - Plugin .js files (mount in Tdarr) - agent_notes/ - Development documentation - Latest-Reports/ - Error logs for analysis
2.1 KiB
User Prompt Log
Records user prompts/requests before agent actions.
2025-12-15 Session
11:15:30 - Implement Reorder Fix
User Prompt:
Impliment that fix
Action Taken: Implementing stream order check in misc_fixes to prevent infinite reorder loop.
11:12:31 - Infinite Loop Analysis Request
User Prompt:
Examine the current Tdarr Plugin stack for any potential infinite loop scenarios that might arise
Action Taken: Analyzing all 4 plugins for reQueueAfter logic and conditions that could cause infinite loops.
11:11:33 - Git Repository Request
User Prompt:
include in your logs under the agent_notes what prompts are given to you before the actions are taken
Action Taken: Creating this prompt log file.
11:10:13 - Initialize Git Repo
User Prompt:
initnialize local as a git repo
Action Taken:
- Initialized git repository in
/Local - Configured user as "Tdarr Plugin Developer"
- Created initial commit with all plugin files
06:30:15 - TS Timestamp Decision
User Prompt:
its been decided that nothing we can do will fix those TS timestamp issues
Action Taken:
- Reverted
-start_at_zerotimestamp fix - Implemented skip logic for corrupt TS files instead
- Updated misc_fixes plugin to detect and skip problematic TS files
05:51:14 - Plan Approved
User Prompt: (System message)
Artifact approved with "LGTM"
Action Taken:
- Implemented all 3 fixes from implementation plan
- Fix 1: TS timestamp handling
- Fix 2: Attachment stream mapping
- Fix 3: ISO/DVD skip logic
2025-12-15 Earlier Session
Error Log Analysis Request
User Prompt:
(Conversation resumed from checkpoint - analyzing error logs from Latest-Reports)
Context from Summary:
- Examined 5 error logs
- Identified 3 distinct failure patterns
- Created analysis report and implementation plan
Format Guide
Each entry should include:
- Timestamp (from ADDITIONAL_METADATA)
- User Prompt (exact or summarized request)
- Action Taken (brief description of what was done)